Commercial Solar Panel Installation Process: What to Expect

Step-by-step guide to the commercial solar panel installation process, from initial survey to final commissioning.

Installation Team
Commercial Solar Panel Installation Process: What to Expect

Understanding the installation process helps you plan effectively and minimizes disruption to your business operations. Heres what to expect at each stage.

Stage 1: Site Survey

A detailed site survey assesses your roof condition, structural capacity, electrical infrastructure, and shading. This information determines the optimal system size and design.

Stage 2: System Design

Engineers design your system based on survey data, optimizing panel placement for maximum generation while considering structural loads and electrical requirements.

Stage 3: DNO Application

For systems over 16A per phase, a Distribution Network Operator application is required. This process typically takes 4-8 weeks and may require grid upgrades for larger systems.

Stage 4: Installation

The physical installation typically takes 2-5 days depending on system size. Work can often be scheduled to minimize business disruption, with most activity on the roof.

Stage 5: Commissioning

After installation, the system undergoes testing and commissioning. This includes electrical safety tests, performance verification, and monitoring system setup.

Stage 6: Handover

You receive full documentation including warranties, MCS certificates, electrical certificates, and monitoring system training.